A. Pipe Clearances to Combustibles
WARNING! Risk of Fire!
Maintain air space clearance
to vent.
DO NOT
pack insulation or other combustibles:
• Between ceiling firestops
• Between wall shield firestops
• Around vent system
Failure to keep insulation or other material away from
vent pipe could cause overheating and fire.
5
Vent Clearances and Framing
Figure 5.1 Horizontal Venting Clearances To Combustible
Materials - Generic Appliance Shown
* When using SLP pipe, minimum clearances from the vent pipe to combustible materi-
als at inside wall firestops are:
Top: 2-1/2 in. (64 mm)
Bottom: 1/2 in. (13 mm)
Sides: 1 in. (25 mm)
Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm).
•
DVP heat shield
- designed to be used on a wall 4 in. to 7-1/4 in. (102 mm to 184
mm)
thick
.
• If wall thickness is less than 4 in. (102 mm) the existing heat shields must be field
trimmed. If wall thickness is greater than 7-1/4 in. (184 mm) a DVP-HSM-B will be
required.
•
SLP heat shield
- designed to be used on a wall 4-3/8 in. to 7-5/8 in. (111 mm to
194 mm thick).
• If wall thickness is less than 4-3/8 (111 mm) the existing heat shields must be field
trimmed. If wall thickness is greater than 7-5/8 in. (194 mm) a DVP-HSM-B will be
required.
(DVP-SLP Pipe Shown)
3 in. (76 mm)
top clearance *
1 in. (25 mm)
clearance
bottom & sides
Heat
Shield
Wall
Shield
Firestop
Heat
Shield
WALL
3 in. (76 mm)
top clearance *
1 in. (25 mm)
clearance
bottom & sides
Heat
Shield
Wall
Shield
Firestop
Heat
Shield
WALL
3 in. (76 mm)
top clearance
1 in. (25 mm)
clearance around
vertical sections
SLP Pipe