System Reference Data
The following information should be filled out and signed by Refrigeration Installation Contractor at time of start-up.
Date System Installed:
_____________________________________________________
Installer and Address:
_____________________________________________________
_____________________________________________________
_____________________________________________________
Condensing Unit
Unit Model#: ________________________________________
Unit Serial #: ________________________________________
Compressor Model #:
____________________ Compressor Model #: _________________
Compressor Serial #:
____________________ Compressor Serial #: __________________
Electrical
_________________ Volts __________________ Phase _______
Voltage at Compressor
L1__________ L2 ___________
L3 ___________
Amperage at Compressor
L1__________ L2 ___________
L3 ___________
Service Record
A permanent data sheet should be prepared on each
refrigeration system at an installation, with a copy for the owner
and the original for the installing contractorʼ s files.
If another firm is to handle service and maintenance, additional
copies should be prepared as necessary.
Summary of Contents for H-IM-FL1A
Page 18: ...18 Control Circuit Wiring Diagram for BACU51 and BACU59 ...
Page 19: ...19 Submittal ...
Page 20: ...20 Submittal ...
Page 22: ...22 Notes ...
Page 23: ...23 Notes ...