02/04
4034-102 Rev F
7
HRV200PLUS INSTALLATION INSTRUCTIONS
E. INSTALLATION DIAGRAMS
Note:
Minimum and maximum clearances must be maintained at all times. Illustrations throughout these instructions reflect
typical installations and are for design purposes only. Actual installation may vary slightly due to individual design preferences.
The illustrations and diagrams used throughout these installation instructions are not drawn to scale.
1. Simplified Installation (Supply/Return Method)
HRV must be balanced.
It is recommended that the furnace blower run continuously or HRV operation be
interlocked with the furnace blower (refer to Section L. Wiring).
Check local codes/authority having jurisdiction for acceptance.
All manuals and user guides at all-guides.com