background image

SnowMeltz® Warranty

Heatizon Systems warrants SnowMeltz® to be free from defects 

in material and workmanship for a period of  ten (10) years and 

Activation Device(s) for a period of one (1) year.  Such warranty 

periods shall commence on the date of shipment by Heatizon 

Systems.  If any parts are found to be defective in manufacture during such time period,  Heatizon 

Systems will, at its sole option, replace or repair defective parts.   

This Limited Warranty applies only if articles sold hereunder (a) are selected, designed, and installed according 

to instruction and operation manuals furnished by Heatizon Systems and installed in a “workmanlike manner” 

according to the building association standards adopted by Heatizon Systems, (b) remain in their originally 

installed location, (c) are connected to proper power supplies, (d) are not misused or abused, (e) show no 

evidence of tampering, mishandling, neglect, damage (accidental or otherwise), modifications or repair without 

the approval of Heatizon Systems, or damage done to the product by anyone other than Heatizon Systems, 

and (f) are installed in accordance with applicable code requirements.  Any warranty claims must be made in 

writing, no later than one (1) month following expiration of the warranty period, and must be accompanied 

by the warranted part or component.  Any claim not made in such manner shall not be honored by Heatizon 

Systems.

This Limited Warranty does not cover:

1.  The workmanship of any installer of Heatizon Systems radiant panel or cable heating products.

2.  Any Heatizon Systems radiant heating products that have a failure or malfunction resulting from improper or negligent 

operation, installation, accident, abuse, misuse, unauthorized alteration or improper repair or maintenance.

3.  Any Heatizon Systems radiant heating products that have had components not purchased from Heatizon Systems 

integrated into or connected to them.

4.  Any labor costs for removal of alleged defective part(s) and/or reinstallation of replacement part(s), transportation to 

and from Heatizon Systems (if necessary) and any other material necessary to perform the exchange or repair.

5.  Any Heatizon Systems heating products that have not been properly registered by completion and return of the 

Warranty Registration Card attached hereto within ninety (90) days of the date of sale.

DISCLAIMER OF WARRANTIES:

 

This warranty described above is in lieu of all other warranties, express or implied, including but not 

limited to any implied warranties of fitness for a particular purpose and merchantability.  Heatizon Systems 

expressly disclaims and excludes any liability for losses, expenses, inconveniences, consequential, incidental, 

indirect, or punitive damages for breach of any express or implied warranty.  By installing and/or purchasing 

Heatizon Systems products, you accept the terms of this limited warranty.

 

Some states do not allow the exclusion or limitation of incidental or consequential damages, or 

limitations on how long an implied warranty lasts, so the above limitations and exclusions may not apply to 

you.  This Limited Warranty gives you specific legal rights, and you may also have other rights which may vary 

from state to state. 

HEATIZON SYSTEMS DISCLAIMS ANY WARRANTY NOT PROVIDED HEREIN INCLUDING THE IMPLIED WARRANTY OF 

MERCHANTIBILITY AND IMPLIED WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE. HEATIZON SYSTEMS FURTHER 

DISCLAIMS ANY RESPONSIBILITY FOR LOSSES, EXPENSES, INCONVENIENCES, SPECIAL, INDIRECT, SECONDARY, 

INCIDENTAL, OR CONSEQUENTIAL DAMAGES ARISING FROM OWNERSHIP OR USE OF THE PRODUCT. THERE ARE NO 

WARRANTIES THAT EXTEND BEYOND THE FACE HEREOF.

Heatizon Systems

4137 South 500 West

Murray, UT 84123

Phone (801) 293-1232 Fax (801) 293-3077

heatizon.com

From Heatizon Systems

4137 South 500 West

Murray, Utah 84123

888-239-1232 | heatizon.com

Summary of Contents for SnoWmeltz

Page 1: ...HEATIZON COM Installation Operating Manual Warranty Registration RADIANT HEATING SYSTEMS SNOW MELTING FLOOR WARMING SPACE HEATING ROOF DEICING GUTTER DEICING 08 2020...

Page 2: ...cementitious material that goes over it Never cross the SnowMeltz Heating Cable over itself or any other conductor or wire When installing Heatizon Systems products strict compliance with the Nationa...

Page 3: ...PLAN THE DESIGN 9 3 4 JUMPERS 11 4 PRODUCT SELECTION 12 5 REQUIRED TESTS FIRST 13 6 AREA PREPARATION 13 7 INSTALLATION 14 CONCRETE 14 ASPHALT 14 SAND BED PAVERS 15 MORTAR BED PAVERS 15 STAIRS 16 8 RE...

Page 4: ...In order to have proper drainage and to reduce the likelihood of vertical shifting of your asphalt concrete or pavers Heatizon Systems recommends that a minimum of 6 inches of high quality aggregate b...

Page 5: ...is damaged it must be replaced or repaired To repair or to splice any part of the system use only Heatizon SnowMeltz Repair Kit part number SMRPKIT 1 General Guidelines 1 1 Use of the Manual This man...

Page 6: ...remely dangerous and can result in a fire Do not cut the heating cable to avoid an obstacle use other methods as described in this manual Make sure to avoid damaging cutting the heating cable during a...

Page 7: ...al Connections MATS Cable Construction Twin Conductor Rated Voltage 120VAC to 600VAC Output 12 watts ft max Length Refer to Individual Product Labels Cable Diameter 0 24 to 0 35 Cable Type Constant Wa...

Page 8: ...lt protection device i e GFCI GFEP etc requirements when installing all heating cable products Do not bend heating cable within 3 of a termination or connection between the heating element and the col...

Page 9: ...be run to the area and or met to the cold lead s Geographic Location Depending on the geographic location of the installation area some adjustments made have to be made during the installation such as...

Page 10: ...entitious material Do not bend the heating cable within 3 of cold connection Activation Devices are the eyes and ears of the heating system Location is important Please reference installation and oper...

Page 11: ...MPERS Control Joints Control Joints are intended to control where the slab will crack and are placed either in fresh concrete or saw cut in after the concrete is poured Spacing of these joints will va...

Page 12: ...34 3 12 6 10 9 60 30 20 14 SM 50W240 37W208 75 3660 30 0 15 3 13 2 75 37 20 10 SM 50W240 37W208 110 5500 9 1 22 9 19 9 110 55 20 10 SnowMeltz Mat Models 50 Watts Ft2 277VAC or 37 Watts Ft2 240VAC Heat...

Page 13: ...installed in a location that will allow it to turn the snow melt system on when it is needed and off when it is not needed Verify the proper location has been selected for the activation device Manual...

Page 14: ...aggregate or concrete base is prepared first Once the base is prepared the installer can begin by placing a grid of welded wire fabric or rebar in preparation for the heating cable The heating cables...

Page 15: ...r and fill size requirements in the NEC and CEC The heating cable portion and connection can not pass into any conduit sleeve Sand Bed Paver Preparation The heating cable may be secured in place by la...

Page 16: ...d Lead s The cold lead s should be run in a conduit to either a junction box panel or activator and should NEVER cross or come in contact with the SnowMeltz heating element 8 Required Tests Second Ins...

Page 17: ...EMOTE IN GROUND The activators usually have a head unit located indoors and have more functionality and have optional in ground sensors that detect moisture temperature on on the concrete asphalt Thes...

Page 18: ...damage by tools or paving equipment and will protect the cable from heat during placement of the main pour Continuously check the insulation resistance of the heating cables to verify that the cables...

Page 19: ...econd Insulation Resistance with Megohmmeter Before during and after installation it is necessary to measure the insulation resistance between the heating conductor and the protective grounding screen...

Page 20: ...he activator should be done AFTER completion of installing the SnowMeltz system and the substrate is fully cured completed M432 ETO2 With Cover Removed Fig 13 1A Fig 13 1B Fig 13 1C The system must no...

Page 21: ...then dial back from there based on the performance of the system Once complete hit ENTER Scroll down to Exit and hit ENTER the initial setup is complete 7 Run an test run of the system to see if every...

Page 22: ...ted for approximately four 4 hours AFTER moisture is no longer detected To change the amount of After Run time adjust the dial labeled DELAY OFF to MIN or MAX to lessen or lengthen the After Run time...

Page 23: ...e SnowMeltz mat s 3 Be sure to follow local code for the correct gauge of wire for a dual pole 30 amp 240v circuit 4 Power to the M326A must be off before wiring the unit 5 Wire the green ground wire...

Page 24: ...Installation and Operation Manual Activator not configured or wired correctly Refer to specific instructions included with the activator purchased for use with this system Area activated continously A...

Page 25: ...stem to overheat and burnout Q Where should the activator sensor be located A Arial or ground sensors must be located in or close to the area s to be heated and must be able to detect moisture unabate...

Page 26: ...Use this grid to layout the SnowMeltz system...

Page 27: ...e had components not purchased from Heatizon Systems integrated into or connected to them 4 Any labor costs for removal of alleged defective part s and or reinstallation of replacement part s transpor...

Page 28: ......

Page 29: ...Information Owner s Name ________________________________________________________________________________________ Home Address _________________________________________________________________________...

Page 30: ......

Reviews: