background image

READ ALL INSTRUCTIONS CAREFULLY BEFORE OPERATING EQUIPMENT 

Revised 2019 

OPERATING MANUAL 

HSE-100 COMBINATION SHRINK SYSTEM 

Summary of Contents for HSE-100

Page 1: ...READ ALL INSTRUCTIONS CAREFULLY BEFORE OPERATING EQUIPMENT Revised 2019 OPERATING MANUAL HSE 100 COMBINATION SHRINK SYSTEM...

Page 2: ...eliminary Setup Adjustments 6 Threading the Film Adjusting the Sealing Platform Operating Procedures 8 L Sealer Operation Shrink Tunnel Operation Machine Controls Adjusting the Sealing Cycle Wrapping...

Page 3: ...is included with your system UNPACKING THE SYSTEM The HSE 100 system is a unitized shrink wrapping machine that combines an L Bar Sealer with a Shrink Tunnel Your system is shipped fully assembled wi...

Page 4: ...eal Conveyor Platform Adjustment Casters Non Stick Mesh Tunnel Conveyor Shrink Tunnel BASIC SPECIFICATIONS Film Capacity 17 Wide Sealing Area 16 W 20 L Working Height 36 H With Leg Kit Inside Tunnel D...

Page 5: ...with a standard perforating roller for venting the film The perforating roller 2 is used to make a series of small holes continuously as the film is being drawn from the roll during normal packaging o...

Page 6: ...corner of the sealing area 3 then loosen the knobs 4 under the film cradle and position the cradle so that the folded edge of the film is even with the back of the package to be wrapped 5 Re tighten t...

Page 7: ...ability under loads To change platform positions STATIC PLATFORM AND ROLLER TRAY The platform position is easily changed by inserting fingers in holes 3 and after lifting slightly slide platform to th...

Page 8: ...the shrink tunnel and the conveyor speed to obtain the desired shrink Because some time is required for the tunnel chamber to adjust to a temperature setting change it is recommended that the conveyor...

Page 9: ...rm down Dwell Time 0 2 seconds The amount of time the seal arm is held down after the seal time has expired and seal wire has de energized Conveyor Speed 0 10 seconds Controls the speed both the tunne...

Page 10: ...film margin on the side and front of the package about 2 inches for adequate shrink The sealing arm is lowered into position 6 which actuates the sealing cycle The two open sides of the film are seale...

Page 11: ...kages See your Heat Seal Price List for replacement part information RECOMMENDED CLEANING L BAR SEALER SEALING WIRES Clean daily Use a soft brass wire brush SEALING PADS Clean daily Wipe clean with a...

Page 12: ...rew 1 Then insert the other end of the wire into the hole on the tensioning screw 4 leaving the wire loose Use a 1 8 Allen Key on the screw head 5 and a 3 8 wrench on the lock nut 6 to tighten the wir...

Page 13: ...WIRE INSULATION CHECK AND CLEAN KNIFE BLADE CHECK CONDITION OF SEALING PADS CHECK CONDITION OF NON STICK TAPE CHECK FOR EVEN ARM AND MAGNET PRESSURE CHECK THE MINIMUM SEALING TEMPERATURES INCREASE TH...

Page 14: ...TURE PROBLEM BURN HOLES HOT SPOTS SOLUTION CHECK THE CONDITION OF THE AIR RELEASE HOLES SPEED UP THE TUNNEL CONVEYOR DECREASE THE TUNNEL CHAMBER TEMPERATURE PROBLEM ERRATIC SHRINK SOLUTION MAKE SURE T...

Page 15: ...15 Revised 2019...

Reviews: