Installation Preparation
Suprasetter A52/A75 – Installation
Installation Preparation
General
Installation of the Suprasetter requires extremely careful preparation and execution. This manual is
designed to assist you in doing this.
It is vital to assess beforehand whether doors and transport paths inside buildings are wide enough
for transporting the Suprasetter to the customer (see Technical Data).
The local power and voltage supply must comply with the machine's power requirements.
Note:
In some cases, shipment of the device includes a loose-leaf binder with specific infor-
mation about the device that is shipped. Take note of this information when installing the
device.
Floor Properties
Make sure to inspect the ambient and floor conditions at the installation site prior to the delivery of
the machine.
Install the machine on a level and solid floor. Make sure the floor can bear the load when installing
the machine. Take appropriate measures to compensate for the settling of soft floors.
Tab. Floor stability
The floor (covering) must have an abrasion-proof, easy-to-clean, smooth surface, it must be antistatic
and meet the following quality requirements:
Tab. Electrical floor properties
NOTICE
Make sure the floor is capable of bearing the machine. If you are in doubt, consult
an architect or construction engineer.
Indentation hardness
2 N/mm²
Max. charge
≤
500 V/cm
Half-life period
≤
30 sec
Leakage resistance
≤
10
9
Ω
Volume resistance
≤
10
10
Ω
i
i
Summary of Contents for Suprasetter A52
Page 6: ......
Page 24: ...Safety 22 Fig 24 Filter replacement Fig 13 4 On the filter unit ...
Page 26: ...Safety 24 Fig 26 Warning sign copy template ...
Page 36: ...Installation Preparation 34 Pallet Installation Instructions ...
Page 82: ...Technical Data 80 Resolution 1000 pixels cm 2540 dpi Type Value Comment ...
Page 84: ......
Page 85: ......