Installation
Suprasetter A52/A75 – Installation
Fig. 67 Chiller
Fig. 68 Filling
1.
Switch off the Suprasetter with the power
switch.
2. Unscrew three screws (Fig. 67/1) and open
the chiller unit.
NOTICE
When preparing the coolant, make absolutely sure that the mixture is clean
because even small amounts of dirt can cause changes in the coolant and can
damage the components in the cooling circuit.
The numbers correspond to the items in the Table
above.
3. Fit funnel (Fig. 68/2) onto the filler hose (Fig.
4. Prepare coolant made up of 1 part Glysantin :
3 parts chlorine-free drinking water, 25% in
the measuring cup (Fig. 68/1).
Initial filling: ca. 1 liter
Top-up filling: ca. 0.2 liters
Summary of Contents for Suprasetter A52
Page 6: ......
Page 24: ...Safety 22 Fig 24 Filter replacement Fig 13 4 On the filter unit ...
Page 26: ...Safety 24 Fig 26 Warning sign copy template ...
Page 36: ...Installation Preparation 34 Pallet Installation Instructions ...
Page 82: ...Technical Data 80 Resolution 1000 pixels cm 2540 dpi Type Value Comment ...
Page 84: ......
Page 85: ......