Commissioning | Configuring the axes
7
Length gauges
Length
gaugeseries
Interface
Signal period
Reference mark
Maximum
traverse path
CT 250x
11
μ
A
PP
2
μ
m
One
25 mm
CT 600x
11
μ
A
PP
2
μ
m
One
60 mm
MT 1271
TTL
0.4
μ
m, 0.2
μ
m
*)
One
12 mm
MT 128x
1 V
PP
2
μ
One
12 mm
MT 2571
TTL
0.4
μ
m, 0.2
μ
m
*)
One
25 mm
MT 258x
1 V
PP
2
μ
m
One
25 mm
MT 60x
11
μ
A
PP
10
μ
m
One
60 mm
MT 101x
11
μ
A
PP
10
μ
m
One
100 mm
ST 127x
TTL
4
μ
m, 2
μ
m
*)
One
12 mm
ST 128x
1 V
PP
20
μ
m
One
12 mm
ST 307x
TTL
4
μ
m, 2
μ
m
*)
One
30 mm
ST 308x
1 V
PP
20
μ
m
One
30 mm
*)
0.2
μ
m or 2
μ
m with 10-fold evaluation
0.4
μ
m or 4
μ
m with 5-fold evaluation
Length
gaugeseries
Interface
Measuring step
Maximum
traverse path
AT 121x
EnDat 2.2
23 nm
12 mm
AT 301x
EnDat 2.2
368 nm
30 mm
86
HEIDENHAIN | GAGE-CHEK 2000 | Operating Instructions | 08/2020
Summary of Contents for GAGE-CHEK 2000 Series
Page 1: ...GAGE CHEK 2000 Operating Instructions Evaluation Unit English en 08 2020 ...
Page 12: ......
Page 13: ...1 Fundamentals ...
Page 22: ......
Page 23: ...2 Safety ...
Page 28: ......
Page 29: ...3 Transport and storage ...
Page 34: ......
Page 35: ...4 Mounting ...
Page 41: ...5 Installation ...
Page 51: ...6 Basic operation ...
Page 74: ......
Page 75: ...7 Commissioning ...
Page 119: ...8 Setup ...
Page 154: ......
Page 155: ...9 Measuring ...
Page 169: ...10 File management ...
Page 176: ......
Page 177: ...11 Settings ...
Page 210: ......
Page 211: ...12 Servicing and maintenance ...
Page 220: ......
Page 221: ...13 What to do if ...
Page 225: ...14 Removal and disposal ...
Page 227: ...15 Specifications ...