Setup | Single steps for setup
8
Selecting axes
Drag the
D/R
function element to the left in the workspace
A dialog box for selecting the axes appears
In order to select axes, tap each diameter symbol
Tap
Close
The selection is saved
When you activate the
D/R
function, the product doubles the
position value of the selected axes
8.3.6
Configuring the
Relative
function
The
Relative
function allows you to measure independently of the selected
preset. When the
Relative
function is active, you can zero axes and perform
measurements, for example, without these actions affecting the selected
preset. When you deactivate the
Relative
function, all of the position values and
measuring steps are once again referenced to the selected preset.
You can activate and deactivate this function by tapping the
Relative
function
element in the Inspector.
Adding a function element
Tap
Measure
in the main menu
Drag an empty field of the Inspector to the left into the
workspace
A dialog box for selecting the function element appears
Tap the
Relative
function element
Tap
Close
The
Relative
function element is available in the Inspector
8.3.7
Configure the
Mastering
function
With the
Mastering
function, you can set the position values in the position
display. To do so, measure, for example, one part on the measuring machine
and save the values from the measuring log as reference part. Furthermore, you
can directly adopt values of a part that you are using as reference part from the
position display. Specify the axes that are affect by
Mastering
when configuring the
function elements.
The following steps are necessary in order to configure the
Mastering
function:
Add the
Mastering
function element to the Inspector
Selecting axes
Enter or apply values that should be set
134
HEIDENHAIN | GAGE-CHEK 2000 | Operating Instructions | 08/2020
Summary of Contents for GAGE-CHEK 2000 Series
Page 1: ...GAGE CHEK 2000 Operating Instructions Evaluation Unit English en 08 2020 ...
Page 12: ......
Page 13: ...1 Fundamentals ...
Page 22: ......
Page 23: ...2 Safety ...
Page 28: ......
Page 29: ...3 Transport and storage ...
Page 34: ......
Page 35: ...4 Mounting ...
Page 41: ...5 Installation ...
Page 51: ...6 Basic operation ...
Page 74: ......
Page 75: ...7 Commissioning ...
Page 119: ...8 Setup ...
Page 154: ......
Page 155: ...9 Measuring ...
Page 169: ...10 File management ...
Page 176: ......
Page 177: ...11 Settings ...
Page 210: ......
Page 211: ...12 Servicing and maintenance ...
Page 220: ......
Page 221: ...13 What to do if ...
Page 225: ...14 Removal and disposal ...
Page 227: ...15 Specifications ...