Settings |
Service
11
Parameter
Explanation
io.xml
Version number of the parameters for inputs and outputs
opticalEdge.xml
Version number of the parameters for OED
peripherals.xml
Version number of the parameters for peripherals
slec.xml
Version number of the parameters for segmented linear error
compensation (SLEC)
lec.xml
Version number of the parameters for linear error compensation
(LEC)
nlec.xml
Version number of the parameters for nonlinear error compensa-
tion (NLEC)
microBlazePVRegister.xml
Version number of the “Processor Version Register” of MicroB-
laze
info.xml
Version number of the information parameters
audio.xml
Version number of the audio parameters
metrology.xml
Metrology parameters
network.xml
Version number of the network parameters
os.xml
Version number of the operating system parameters
runtime.xml
Version number of the runtime parameters
serialPort.xml
Version number of the parameters of the serial interface
users.xml
Version number of the user parameters
GI Patch Level
Patch level of the golden image (GI)
11.7.2
Back up and restore
Path:
Settings
►
Service
►
Back up and restore
The unit’s settings or user files can be backed up as a file so that they are available
after a reset to the factory default settings has been performed or for installation
on multiple units.
Parameters
Explanation
Restore settings
Restoring of the backed up settings
Back up settings
Backing up of settings of the product
Restore user files
Restoring of user files of the product
"Restore user files", Page 217
Back up user files
Backing up of user files of the product
"Back up user files", Page 118
206
HEIDENHAIN | GAGE-CHEK 2000 | Operating Instructions | 08/2020
Summary of Contents for GAGE-CHEK 2000 Series
Page 1: ...GAGE CHEK 2000 Operating Instructions Evaluation Unit English en 08 2020 ...
Page 12: ......
Page 13: ...1 Fundamentals ...
Page 22: ......
Page 23: ...2 Safety ...
Page 28: ......
Page 29: ...3 Transport and storage ...
Page 34: ......
Page 35: ...4 Mounting ...
Page 41: ...5 Installation ...
Page 51: ...6 Basic operation ...
Page 74: ......
Page 75: ...7 Commissioning ...
Page 119: ...8 Setup ...
Page 154: ......
Page 155: ...9 Measuring ...
Page 169: ...10 File management ...
Page 176: ......
Page 177: ...11 Settings ...
Page 210: ......
Page 211: ...12 Servicing and maintenance ...
Page 220: ......
Page 221: ...13 What to do if ...
Page 225: ...14 Removal and disposal ...
Page 227: ...15 Specifications ...