4. Pick-up
HELENOS III
7
4.5. Mounting Measurements
G
L
35
19
Fig. 3: Measurements of Pick-up
Measures L
G
Remarks
Type (mm)
01 - 38
38
M 16 x 1,5
02 - 76
76
M 16 x 1,5
appropriate
03 - 102
102
M 16 x 1,5
plug
11 - 38
38
5/8"-18UNF-2A
SV6-IA-2K
12 - 76
76
5/8"-18UNF-2A
13 - 102
102
5/8"-18UNF-2A
Ordering specification, e.g. IA 02-76
4.6. Redundant Speed Signal
If precautions are to be taken with regard to failures of the pulse pick-up, a second pulse
pick-up can be connected to the control unit. In case that an electric generator with
terminal W is available, this signal may be used for emergency operation as well as any
other signal of a tachogenerator.
In case of a failure on puls pick-up 1, the governor automatically switches over to the
redundant speed signal and gives an alarm.