12. Ordering Specifications
Helenos III
43
12.4. Cable lengths
It is of advantage to obtain the harness together with the governor.
The necessary cable lengths have to be registered here and transfered to HEINZMANN.
Please note: It is not possible to use all signals simultaneous because some inputs and
outputs of the governor have various options depending on the application.
Version of Control Unit:
with plugs (IP55)
with terminal strip (IP00)
Version of Actuator:
with plug (IP55)
with terminal strip (IP00)
a) L1 = Control unit - battery
L 1
Control unit - battery
.................. cm
Cable size
up to 15 m
2 x 2.50 mm²
over 15 - 30 m
2 x 4.00 mm²
b) L2 = Control unit - actuator
L 2.1
Control unit - actuator (feedback)
.................. cm 3 x 0.75 mm² shielded
L 2.2
Control unit - actuator (power)
.................. cm
Cable size
up to 10 m
2 x 2.50 mm²
over 10 - 20 m
2 x 4.00 mm²
over 20 - 40 m
2 x 6.00 mm²
c) L3 = Control unit - setpoint adjusting unit
L 3.1
Control unit - setpoint poti 1
.................. cm 3 x 0.75 mm² shielded
L 3.2
Control unit - setpoint poti 2
.................. cm 3 x 0.75 mm² shielded
L 3.3
Control unit - 4-20 mA input
.................. cm 2 x 0.75 mm²
L 3.4
Control unit - synchronizer
.................. cm 2 x 0.75 mm² shielded
L 3.5
Control unit - load measuring unit
.................. cm 2 x 0.75 mm² shielded