Getting Started
4.6.1
How to Connect Cables and Plugs
If there is enough space left behind the Energy Manager, you can first
connect the cables to the wiring board and then attach the I/O Panel to
the 128 pin plug connector. If there is not enough space, you have to pull
the Energy Manager with I/O Panel out about 20 cm and insert the
connections to the back side from the front. You can also rotate the
Energy Manger by 90 degrees and insert the connections from the side.
Energy Manager attached to a 19-inch rack
All communicating cables from sensors and actuators are
transferred to the rack
Side cutter, connectors, wire-end ferrules
Proceed as follows for all connections:
1.
Cut cable to length with a side cutter.
2.
Insulate cable with wire-end ferrules.
3.
Secure cable in the connector by tightening the screws.
When installing the standard configuration:
4.
Insert connector and cable to the I/O Panel according to
Table 4-2.
TIP
When installing a customer-specific configuration or to change the default
settings, see LAA documentation and wiring diagram.
4.6.2
Port Assignment
Port assignments can be delivered as a configuration package or
administered via LAA. As a default configuration, no ports are assigned.
The port assignment described in this chapter is one possibility for
configuring the ports and does not necessarily represent every customized
solution.
The contact allocation may not exceed the values listed in
Table 4-1
:
Contact
Value
Analog inputs: T1 – 5
PT 1000
Open Collector PWM Control
Signal: PWM 1 – 2
2 ports, 0-100%
Galvanic Isolation
Max: 60V, 4mA
(configurable)
Digital input: DI 1 – 8
Low Level: 0 – 2 V
DC
High Level: 5 – 30 V
DC
Alarm output: Rel 1 – 8
8 x dry contacs
Max.switching current: 0.5 A
Max. switching voltage: 60 V
DC
Max. switching power: 30 W
Analog inputs: AI1 – AI9
0–20 mA or 0-10V
DC
(configurable)
Contact allocation
Energy Manager 2.0 - Instruction Manual
27
Summary of Contents for Energy Manager 2.0
Page 1: ...Energy Manager 2 0 Instruction Manual ...
Page 6: ......
Page 14: ......
Page 78: ......
Page 93: ...Energy Manager 2 0 Instruction Manual 93 ...
Page 94: ......
Page 101: ...Heliocentris Industry GmbH Rudower Chaussee 29 12489 Berlin Germany http www heliocentris com ...