Attach the 2-slotted connection of the power supply cable (2) to the
Energy Manager’s power board.(Figure 8-6).
Figure 8-6 Connect power board and IOBoard 6
1
IO Board 6 Connection
2
Power board connection
8.
Attach the communication cable to IOBaord6 (Figure 8-7)
Figure 8-7 Attach communication cable on IOBoard6 of Extension Board
9.
Put the cover back on the extension board and fasten with 2 M3
screws.
Figure 8-8 Scrws (1) to fasten Extension Board on Energergy Manager
The extension board is connected with the Energy Manager and
can now be mounted to the rack (see 8.5.4).
Attach communication
cable to Extension Board
Close Extension Board
Energy Manager 2.0 - Instruction Manual
85
Summary of Contents for Energy Manager 2.0
Page 1: ...Energy Manager 2 0 Instruction Manual ...
Page 6: ......
Page 14: ......
Page 78: ......
Page 93: ...Energy Manager 2 0 Instruction Manual 93 ...
Page 94: ......
Page 101: ...Heliocentris Industry GmbH Rudower Chaussee 29 12489 Berlin Germany http www heliocentris com ...