Getting Started
4.2.2
Installation Tools
The following tools are needed for a standard installation:
Standard tool box including:
−
Hex keys
−
Set of wrenches (metric)
−
Flathead screw driver set
−
Grippers
−
Wire cutter
−
Crimping tool
−
1 - 6 mm² duct tape
−
Set of connectors
Digital multimeter
Clamp-on ammeter DC
4.2.3
How to Mount the Energy Manager
The Energy Manager is attached to an available unit of a 19-inch- high
rack unit.
The rack is fastened with wall or floor fasteners to prevent it from
tilting over.
4 screws
Screw driver
Install the Energy Manager as follows:
1.
Hold the Energy Manager from the front side with both hands and
insert it into the rack.
If there is enough space for wiring from the back side of the Energy
Manager:
2.
Fasten the device with 2 screws on the left and 2 screws on the right
sides.
If there is not enough space for wiring from the back side of the Energy
Manager:
Proceed directly with wiring the device (see
on page 26). Only after wiring should you
fasten the device as described above.
4.3
How to Connect the Antenna
Antenna and antenna cable are installed by the service team during the
implementation of the entire system.
Antenna cable (5 m) with the installed coaxial connector
Connect the antenna cable as follows:
Insert the antenna connector to the antenna port on the front of
the Energy Manger and screw in the coaxial connector.
The antenna is connected to Energy Manager.
Energy Manager 2.0 - Instruction Manual
25
Summary of Contents for Energy Manager 2.0
Page 1: ...Energy Manager 2 0 Instruction Manual ...
Page 6: ......
Page 14: ......
Page 78: ......
Page 93: ...Energy Manager 2 0 Instruction Manual 93 ...
Page 94: ......
Page 101: ...Heliocentris Industry GmbH Rudower Chaussee 29 12489 Berlin Germany http www heliocentris com ...