Temperature Control System WHS HE
Installation and Operating Instructions
9
EN
EN
2�5 Dimensions
2�6 Electrical connection / commissioning
The safety instructions in chapter 1�2 must be observed!
– The electrical connection and commissioning are to be carried out in accordance with the relevant wiring diagram
and are only to be carried out by a certified electrician.
– All relevant standards, safety regulations (e.g. DIN VDE 0100), as well as the technical connection
conditions of energy suppliers are to be adhered to!
– Network configuration, voltage and frequency must be consistent with the rating plate information.
– Protective conductor, including additional potential equalisation connections must be properly installed!
– Check designated use of the assembly
– Compare mains voltage to rating plate data
– Check all parts for tightness, particularly fittings, water connections and pipes.
– Compare power consumption to rating plate data
230
360
100
190
55
G1
WHSH HE 24V
G1
G 1
100
G 1
G 1
G 1
315
WHS HE
Fig� 10
ATTENTION