CCR961 MANUAL-GB
18
Version B2:01-07-2015
4
CCR installation
4.1
Unpacking the CCR shipment
The CCR’s are supplied on a pallet, and covered in a plywood box.
Remove the screws in the top and bottom of the plywood box, and the box can be lifted off the
CCR pallet, and folded.
The CCR cubicle are bolted to the pallet. Remove the bolts and eventual additional transport
support for the output transformer and the CCR cubicle can be removed from the pallet.
4.2
Before the installation
Check the planned installation location. The floor must be stable, and the CCR cubicle must
be fastened to the floor. The room must be ventilated and free air circulation from under the
cubicle must be secured. If this cannot be guaranteed, a special front door with air-inlets must
be ordered.
The CCR cubicles can be placed directly next to another, and as all services can be performed
from the front the CCR cubicle can be placed with the backside directly to a wall.
4.3
CCR installation