US
DE
Automation Instructions CPK • 10-2015 •106-29009
Installation
13
5 .1 .5 Connecting the tool
f
Connect the tool to the power pack with control box
(see the Operating Instructions for the tool).
f
If applicable, connect the foot-operated switch to the
power pack with control box.
f
Make sure that all the wiring is free of kinks.
f
Make sure that there is nothing to obstruct accessibility
to the tool, the power pack with control box and the
cable-tie reel.
NOTE
To avoid signal disruptions, position the power pack with
control box no more than 5 m away from the tool.
5 .1 .6 Installing the waste disposal equipment
The cut offs drop through an opening in the base plate into
a waste container.
The waste container is not included in the scope of supply
and must be manufactured and installed on a case-to-case
basis by the customer/operating company.
f
Position a container of adequate size underneath the
base plate.
f
Make sure that there is nothing to obstruct access to the
waste container.
f
Check the container at regular intervals during operation
and dispose of the waste.
Summary of Contents for Autotool 2000 CPK
Page 1: ...A u t o t o o l 2 0 0 0 TOC Cover Automation Instructions Automatisierungsanleitung...
Page 2: ...2 US English DE Deutsch Automation Instructions 3 Automatisierungsanleitung 37...
Page 36: ...US DE Automation Instructions CPK 10 2015 106 29009 Appendix 36 9 5 Cable tie strip...
Page 70: ...US DE Automatisierungsanleitung CPK 10 2015 106 29009 Anhang 70 9 5 Bandkette...
Page 71: ......