US
DE
Automation Instructions CPK • 10-2015 •106-29009
Installation
14
5 .2 Installing the overhead suspension CPK
Safety
WARNING
Hazard due to falling tool and parts
Risk of severe head injuries
f
Install the overhead suspension in strict compliance
with correct procedure.
f
Wear a hard hat while installation is in progress.
Tools needed
• Open-ended wrench, w/f 13
• Allen key, w/f 4
5 .2 .1 Assembling the overhead suspension CPK
7
1
2
3
6
5
4
f
Secure rail runner
1
with screws
7
to upright
2
.
f
Slip reel mount with clamping ring
3
through upright
2
.
Be sure to check that direction of rotation of the pinion.
The pinion must be able to engage.
f
On the opposite side of upright
2
, slip cable-tie strip
tensioner
4
on to reel mount with clamping ring
3
.
f
Install washer
5
and acorn nut
6
and tighten.
f
Secure overhead suspension CPK with rail runner
1
at
the intended and suitable position in accordance with
correct procedure.
f
For details of weight and bore-hole spacing, consult
the technical data,
f
Check that everything is firmly secure.
Summary of Contents for Autotool 2000 CPK
Page 1: ...A u t o t o o l 2 0 0 0 TOC Cover Automation Instructions Automatisierungsanleitung...
Page 2: ...2 US English DE Deutsch Automation Instructions 3 Automatisierungsanleitung 37...
Page 36: ...US DE Automation Instructions CPK 10 2015 106 29009 Appendix 36 9 5 Cable tie strip...
Page 70: ...US DE Automatisierungsanleitung CPK 10 2015 106 29009 Anhang 70 9 5 Bandkette...
Page 71: ......