US
DE
Automation Instructions CPK • 10-2015 •106-29009
Installation
15
5 .2 .2 Installing the power pack with control box
1
4
3
2
f
Remove screws
1
from power-pack holder
2
.
f
Slide power pack
4
over power-pack holder
2
from
below.
f
Insert screws
1
into holes
3
and tighten.
5 .2 .3 Inserting the tool
CAUTION
Crush hazard when jaws close.
f
Always keep the power pack CPK switched OFF
while installation is in progress.
1
2
3
4
f
Turn adapter
2
on hanger
1
until groove
3
in the collar
clears pin
4
.
f
Pull out pin
4
and remove adapter
2
.
3
5
6
f
Slacken screws
6
in tool
5
.
f
Use the screws to secure adapter
2
to tool
5
.
f
Insert the tool with the adapter into the mount on
hanger
1
.
f
Turn hanger
1
until groove
3
in the collar clears the
opening for the pin.
f
Fully insert pin
4
.
;
In operating condition the collar of the hanger prevents
the pin from slipping out.
Summary of Contents for Autotool 2000 CPK
Page 1: ...A u t o t o o l 2 0 0 0 TOC Cover Automation Instructions Automatisierungsanleitung...
Page 2: ...2 US English DE Deutsch Automation Instructions 3 Automatisierungsanleitung 37...
Page 36: ...US DE Automation Instructions CPK 10 2015 106 29009 Appendix 36 9 5 Cable tie strip...
Page 70: ...US DE Automatisierungsanleitung CPK 10 2015 106 29009 Anhang 70 9 5 Bandkette...
Page 71: ......