Component Replacement
62
17730-241
AR2
™
40K • 46K
FIguRE 8‑47
FOLLOW THE SAFETY GUIDELINES FOR OPERATING THE TORCH . USE CAUTION AS PARTS MAY
BE HOT .
FIguRE 8‑48
ASSEMBLY
1 . Clean the open end of the
center bushing bore to
approximately 1" (25 .4 mm)
depth of weld and debris .
2 . From the open center bush-
ing slide the new cross tube
into both center bushings .
3 . It may be necessary to use
a floor jack under one (1)
or both equalizing beams to
align the cross tube .
4 . Position the end plug ¼" (6 .35 mm) recessed in the center bushings and tack weld, see
Figure 8-48 .
5 . Check end plug position, final weld shall be a ¼" (6 .35 mm) fillet .