AR2 Conversion from RT•RTE
66
17730-241
AR2
™
40K • 46K
3 . Mount the linkage in a vertical position .
dO NOT
back out the studs from the height control
valve body . Loosening the studs may cause the height control valve to leak .
4 . The arm on the height control valve requires enough clearance to allow for 45 degrees of
travel without contacting any chassis components . The lower mounting bracket
MuST
be
positioned on the rear of the trailing arm top surface .
5 . Weld the lower mounting bracket into position .
6 . Recheck the height control valve bracket and linkage for proper operation when installed .
7 . Verify ride height, refer to the Alignment & Adjustment section of this publication .
AIR SuSpENSION duMp VALVE
When installing an AR2 suspension conversion kit, it is required that a height control valve with a
dump feature be installed as part of the suspension air system . Contact the vehicle manufacturer
for the proper dump switch and follow their dump switch installation instructions . Refer to the
Parts List section of this publication .
SuSpENSION AIR SYSTEM pRESSuRE gAugES
Hendrickson recommends when installing an AR2 suspension conversion kit, to have two (2) in-
dash air pressure gauges installed . These gauges will help determine equal loading of the vehicle
as well as indicate any potential suspension air system problem . If in-dash air pressure gauges
are installed, follow the air pressure gauge manufacturer’s installation instructions .
FRAME HANgER INSTALLATION
The AR2 frame hangers will be supplied in the suspension kits as blanks . Therefore, it is necessary
to drill the hanger mounting holes in the blank hangers, see Figure 9-5 . The procedure to drill
the mounting holes in the hangers can be accomplished by two different methods . Whichever
method is used (
1
or
2
), it is important to use a sharp drill bit and keep the bit cool and lubricated
while performing the drilling operation .
FIguRE 9‑5
■
Method 1 —
is to clamp the blank hanger to the frame and line up the existing holes in the
frame from the RT hanger . Back drill the AR2 blank hanger using the existing holes as a guide .