DEEP-FREEZER AND STORAGE RANGE
page 12 out of 37
-
Positioning of the machine
Using dimensions of the table of the Technical Data and following diagram, mark the contour of the machine on
the ground. Leave a space of 5cm around the machine to avoid corrosion. Never press it against the wall.
Envisage the place for the tube passage and the drain of condensate siphon.
-
Verifying the panels
The machines are labeled with a number in a sticker placed with evidence on the panels. It is advisable to check
the presence of all the panels on the pallets thanks to the burst sight view of the equipment.
TYPE
CHEEK
GROUND
FUNDS
CEILING
FRONTAGE
RS10
– MAJOR DUO
2
CS10
– DUO 2
RCN20
– RCP20
CCN20
– CCP20
00-00
10
11
12
13
RS30
–MAJOR
QUATTRO2
CS30
– QUATTRO 2
00-00
10-30
11-31
12-32
13-33
RS50
CS50
RCN60
– RCP60
CCN60
– CCP60
00-00
10-30-50
11-31-51
12-32-52
13-33-53
RS70
CS70
RCN80
– RCP80
CCN80
– CCP80
00-00
10-30-50-70
11-31-51-71
12-32-52-72
13-33-53-73
RS90
CS90
00-00
10-30-50-70-90
11-31-51-71-91
12-32-52-72-92
13-33-53-73-93
RS110
CS110
00-00
10-30-50-70-90-110
11-31-51-71-91-111
12-32-52-72-92-112
13-33-53-73-93-113
During the assembly of the panels, make sure that they are not shifted between each other, and
check the anchoring hook in the female part.
Before the panels’ installation, remove film of protection found on the metal sheet of the panels
(except the ground panel). The assembly of the panels is done by the inside..
1.1 Panneau de sol
posé à l’envers
Refrigerating
connection
and Power
suply