background image

173

172

Te

chnical

guide

Technical guide

Technical guide

Technical guide

Overall adhesion with tackifier emulsion adhesive

A gripping primer compatible with the tackifier emulsion adhesive and the subfloor must be applied before gluing.

1 - Positioning of the floor covering

The tiles should be removed from their box at least 24 hours before laying and placed in the room in which they are to
be used

2 - Tackifier emulsion adhesive

The tackifier emulsion is applied in a single coat:

• using a finely notched trowel, quantity 100 to 150 g/m

2

, type A1,

• using a foam roller, quantity 100 to 150 g/m

2

.

3 - Laying of tiles. Alignment.

A - When laying the tiles, the following points must be respected:

• use whole tiles or large cut tiles (more than 50% of the original tile size), in heavy traffic zones 

(door thresholds, corners in corridors, waiting areas),

• align a row of tiles along the main access paths,

• align one of the start lines with the longest wall-to-wall direction in the room.

B - Alignment.

Trace a guide line along which the tiles are to be laid (see fig 1).

4 - Preparation of subfloor and laying of tiles.

Beware installation directions according to the pattern.

• Spread the tackifier emulsion adhesive over half the room.

• Lay the first row of tiles along the axis perpendicular to the door.

• Block this row in place using the wall as a support (see fig 2).

• Lay the following rows of tiles and block them against the first row.

5 - Smoothing.

This operation must be carried out in two stages .

• Smooth down manually.

• Roll with a 50 kg flooring roller over the entire surface.

Positioning of furniture.

When positioning furniture, pay attention not to drag heavy objects 
over the floorcovering

Laying procedure for Saga

1

2

Tracing the guide lines:
• axis perpendicular to main entrance,
• the perpendicularity of this axis is

balanced by the tile cuts.

• Starting in the middle of the room, lay

the tiles of the middle row. Block this
row in place using the wall
perpendicular to this row as a support.

• Lay the following rows of tiles and 

block them against the first row.

1

1

2

2

Te

chnical

guide

Other cases: 

Reverse lay the following products: Nera Contract, Taralay Comfort. Please note the reverse lay symbols on the packaging. 
Most sheet products are laid by overlapping the edges and cutting through.
Tarasafe Standard, Tarasafe Iona, Tarasafe Comfort, Tarasafe Plus, Tarasafe Ultra, Tarasafe Style, Tarasafe Super however should be laid with a 1 mm
gap to allow for the grooving machine. Grooving should be done manually.

1. 

Lay first length along guide line, ensuring sheets are laid lengthways

in the same direction as the light falls.

Beware installation directions according to pattern.

2.

Fold back sheets half way.

3.

Use a finely serrated trowel to apply the single stick acrylic emulsion adhesive. 

The adhesive manufacturer's instructions must be followed.

Insufficient open time of the adhesive will cause bubbles.

If the open time is too long the adhesive transfer will be poor.

4.

Smooth down manually then roll with a 50 kg flooring roller.

5. 

If necessary groove and heat weld the joints after 24 hours after installation.

Do not traffic the floorcovering for 48 hours after installation

.

Sheet laying procedure

The sheets must be unrolled and left in the room to be covered, with
the adhesive, for at least 24 hours prior to laying.

Minimum temperature must be 15 °C.

Summary of Contents for SubFloor

Page 1: ...ities and must not be contaminated with paint plaster oil grease or any other substance which could affect adhesion Cracks must be filled with an appropriate material The following information provide...

Page 2: ...y increased to normal working temperatures over 5 7 days Glueline temperature 28 C contact technical department for further information Old carpeting Remove clean the subfloor and apply a smoothing co...

Page 3: ...furniture When positioning furniture pay attention not to drag heavy objects over the floorcovering Laying procedure for Saga 1 2 Tracing the guide lines axis perpendicular to main entrance the perpen...

Page 4: ...dhesive which has low water content Copper strips code 0584 Width 1 cm Average length 250 lm Thickness 6 100 mm Weight about 3 6 kg 1 Apply a conductive primer The coverage should be 100 150 g m2 Leav...

Page 5: ...as a guide line It is beneficial to place a flat straight edge beneath the joint to be cut This will avoid damaging the subfloor and ensure a tight butt joint is achieved Butt the sheet edges togethe...

Page 6: ...Nera Contract Mipolam Activa 250 Mipolam Troplan 100 Classic Imperial Ambiance GTI GTI AS Decor Attraction Creation Artline Except Slate and Peeble PUR treatment is a protective polyurethane surface...

Page 7: ...DYNATECH CLEAN FRESH ECOLINE N 7 BRIAL JONTEC 300 CALYPSO DYNATECH ALKA AZ 70 NEOMAT A JONTEC COMBINET TASKI FORCE DOPOMA INTENSO ALKALINE CLEANING AGENT SUPER CLEANER JONTEC STRIDE JONTEC DEGRAISSAN...

Page 8: ...182 Technical guide Due to printing limitations there may be variations between the colours of the actual flooring and illustrations shown in this catalogue Samples are available upon request Notes...

Reviews: