Model HCH-930/932
2-18. DRAWER GASKET
3. Remove the 4 screws securing the backing plate and gasket to
(Continued)
the drawer front.
4. Separate the drawer frame from the drawer front.
5. Remove the gasket from the drawer.
6. Fit new gasket into place in the drawer front.
Step 3
7. Reassemble the drawer frame and drawer front in reverse order
of disassembly. Center the 2 drawer handle spacers over the
screw holes so the handle screws pass through the spacers.
2-19. DRAWER AND LINER
Apply Loctite to screw threads when replacing drawer bearing kit
BEARING REPLACEMENT
(part no. 14094), or liner bearing kit (part no. 14095). If using exist-
ing hardware, clean threads of any old Loctite before applying new
Loctite sealant (part no. MS01-158). Perform this procedure after
store closing to ensure Loctite has a chance to dry before using the
cabinet. Bearings are to stay stationary, and are not to roll with the
drawers.
2-12
203
Summary of Contents for HCH-930
Page 1: ...TECHNICAL MANUAL Henny Penny Heated Holding Cabinet Model HCH 930 Model HCH 932...
Page 2: ......
Page 4: ...ii 703...
Page 8: ...Model HCH 930 932 THIS PAGE INTENTIONALLY LEFT BLANK 1 4 703...
Page 21: ...Model HCH 930 932 807 2 13 2 20 WIRING DIAGRAMS...
Page 22: ...Model HCH 930 932 2 14 807 2 20 WIRING DIAGRAMS Continued...
Page 23: ...Model HCH 930 932 807 2 15 2 20 WIRING DIAGRAMS Continued...