2
I N S TA L L AT I O N
(TH__21) Components:
Identify all components are present prior
to installation.
1. Waste
Body (x1)
2. Ridged Rubber Washer
(x1)
3. Silicone
Washer
(x1)
4. Flange
(x1)
5. Clicker Mechanism
(x1)
6. L-Pipe
(x1)
7.
Overflow Face
(x1)
8.
Ridged Overflow Washer
(x1)
9. Rubber Washer
(x1)
10.
Overflow Elbow
(x1)
11. Conical
Washer
(x2)
12. Hex
Nut
(x2)
1. Check the dimensions of your bath to make sure
that the waste assembly will fit to your bath. The
L Pipe is a fixed length and should not be adjusted.
2.
Place the ridged rubber washer (2) on to the waste
body (1) and offer to the underside of the waste hole.
3.
Position the silicone washer (3) on to the flange (4)
and secure into the waste body from above; on the
inside of the bath. Screw in the clicker mechanism (5).
4.
Place the overflow elbow (10) behind the bath, with
the rubber washer (9) in front of it. Secure
in place by screwing the overflow face (7) from
the inside of the bath, with the ridged overflow
washer (8) behind it.
5.
Insert the L Pipe (6) short end first into the waste
body (1). Ensure a conical washer (11) is at the end of
the tube, and connect to the waste body (1) by
using a hex nut (12).
6.
Repeat the process to fit the long end of the
L Pipe (6) to the overflow elbow (10).
7.
Test the clicker mechanism (5) by pressing down
to close, and pressing again to open. Check all
joints and connections for leaks.
70
465
210
G1 ½
ø70
ø26
95°
1
2
3
4
5
6
7
8
9
01
11
12