Program Controller RT100D 

 
switch:  

 

Prog 

switch:  

 
                 

please press this switch a few times , 

                

if you get the right program number on 

                

the display please stop pressing the key. 

 switch:   

start/stop 

 

                 

Program will start 

  

 Here you find the list of the fixed programs: 
 

 

 

Programm No:    

7 - 9 are all zero. 

Descprition: 

               All time values are in hours and minutes. 
0h30  =   0 hours and 30 minutes 

  

    Zeit 1:  delay time 

    Zeit 2:  ramptime 

 

Temp 1:  first set point 
Temp 2:  top temperature 

 
                  Zeit 3:  soak time 

Programm 

Nr. 

  

P1 

P2 

P3 

P4 

P5 

P6 

Zeit 1 

0h 00 

0h 00 

0h 00 

0h 00 

0h 00 

0h 00 

Zeit 2 

4h00 

5h 00 

7h 00 

10h 00 

3h 00 

4h 00 

Temp 1 

500°C 

500°C 

500°C 

930°C 

400°C  400°C 

Temp 2 

1230°C 

1230°C 

1230°C 

1230°C 

800°C  800°C 

Zeit 3 

0h 30 

1h 00 

1h 00 

1h 00 

0h 30 

1h 00 

 

3.2 Program Adjustment 

If you like to adjust program datas you should use the following description: 

Please load and start your programm 

( see section 3.1) and press the following switches:  

switch:     

start/stop 

switch:  

 

   

 

please press this switch a few times if the 

               

right data is displayed stop pressing. 

switch:  

 

 or 

 

  

 

 to adjust values 

If you have changed all datas like you wish, you can start your programm with the start/stop switch. 

switch:  

 

start/stop 

This adjustment that you have made will only used for the present fireing. If you like to store this datas 

into the memory, please use the following way: 

switch:  

 

set Prog 

   

switch:  

 

start/stop 

Important:

 

The delay time can not be stored in memory.  

Summary of Contents for RT 100 D

Page 1: ...andwerkerpark 1 D 45309 Essen Telephone 49 201 89911 0 Telefax 49 201 89911 20 Email kontakt hermes electronic de Internet http www hermes electronic de 2004 HERMES electronic GmbH OPERATING INSTRUCTIONS Program Controller RT100D ...

Page 2: ... Controller RT100D Contens page Introduction 3 2 First Start 4 3 Description of the face 3 1 Using of fixed programs 5 3 2 Program Adjustment 7 4 Use of Program Datas 8 5 Error Messages 9 6 Technical Datas 11 Notiz ...

Page 3: ...ln during fireing Every control unit RT100D is tested and checked for 100 of quality in our company All our control units have an overheating safety relay but if you use the control units you should observe the fireing Do not fire the kiln without observing If you have any problems please have a look into the error list at the end of this manual If you are not able to solve your problems by yourse...

Page 4: ...0Minutes If thekilnis toslow thecontrol unit shows F1 causes heatingelement is faultyor toold with3PhaseSystems onPhaseis missing Thermocoupleis short connected door switchis not closed Display F2 Istheheatingtimeinthefull power periodelonger than18hours thekilnwill switchedoff andthe displayshows F2 causes heatingelement is faultyor toold with3PhaseSystems onPhaseis missing Display F3 If themeasu...

Page 5: ...e control unit will start the program The first point of working is the delay time After you have programmed the delay time the controller wait till this time is zero On the display you will see the value of the delay time The control unit starts the fireing program as soon as the delay time reached zero This feature will be used if you like to start a kiln e g in the evening The fire process begi...

Page 6: ...0 C 500 C 500 C 930 C 400 C 400 C Temp 2 1230 C 1230 C 1230 C 1230 C 800 C 800 C Zeit 3 0h 30 1h 00 1h 00 1h 00 0h 30 1h 00 3 2 ProgramAdjustment If you like to adjust program datas you should use the following description Please load and start your programm see section 3 1 and press the following switches switch start stop switch please press this switch a fewtimes if the right data is displayed ...

Reviews: