Maintenance schedule
76
11
MAINTENANCE SCHEDULE
(Some points have also been prescribed in accordance with TGPF 118 H!)
For safety reasons, maintenance must only be carried out with the main
switch turned off. However, first of all, the system must be switched off by
means of the On/Off button and you must wait for the burnout phase. If you
have to climb into the storage tank or bunker, always make sure that there
is a second person available to supervise you.
Potential carbon monoxide enrichment may put your life in danger.
11.1
Weekly Inspection
Item
Procedure
Total system
Check the whole boiler system (1)
including the fuel storage room (2)
visually for damages and wear.
Repair discovered faults immediately.
Quench water
container
Check extinguisher container filling
level.
and refill if necessary. If re-filling
occurs
frequently,
contact
your
contracting party.
11.2
Monthly inspection
every 1
–4 weeks
(depending on the
operating hours earlier)
a) Open maintenance cover on both
sides of heat exchanger (HE). If
necessary remove ash.
b) For
HE-cleaning,
check
the
movement of the turbulators and
switch them on via the aggregate
test
c) *In the case of central ash, open
the
pusher
container
maintenance cover. Check for
slag or foreign objects
d) * Check ash locks for operation
(MAIN MENU - Outputs II + III -
AGGREGATETEST - FAS-ON)
*
only at
FAS
optionally (
central de-
Ashing system)
1
2
Summary of Contents for BioFire 1000
Page 1: ...OPERATING INSTRUCTIONS Wood chips pellets heating system BioFire 500 600 800 1000 1250 1500 ...
Page 89: ...Annex 14 89 14 ANNEX 14 1 Additional boiler module Hydraulic recommendation 1 ...
Page 90: ...14 Annex 90 Hydraulic recommendation 2 ...
Page 91: ...Annex 14 91 14 2 Solar module Program 1 ...
Page 92: ...14 Annex 92 Program 2 ...
Page 93: ...Annex 14 93 Program 3 ...
Page 94: ...14 Annex 94 Program 4 ...
Page 95: ...Annex 14 95 Program 5 ...
Page 96: ...14 Annex 96 Program 6 ...
Page 97: ...Notes 15 97 15 NOTES ...