Maintenance schedule
11
79
11.3
Biannual inspection
Heat exchanger
a) Open maintenance cover of heat
exchanger (HE). If necessary
remove ash.
b) Check HE-cleaning and switch
them on via the aggregate test.
c) If required, the "HE top cover",
the "top insulation" and the "top
HE cover" must also be removed
to clean the heat exchanger
(WT).
d) Remove
deposit
and
check
turbulators visually for damages
and wear.
Flange bearing
Bearing lubricate inside
(see lubrication schedule at page 80)
Summary of Contents for BioFire 1000
Page 1: ...OPERATING INSTRUCTIONS Wood chips pellets heating system BioFire 500 600 800 1000 1250 1500 ...
Page 89: ...Annex 14 89 14 ANNEX 14 1 Additional boiler module Hydraulic recommendation 1 ...
Page 90: ...14 Annex 90 Hydraulic recommendation 2 ...
Page 91: ...Annex 14 91 14 2 Solar module Program 1 ...
Page 92: ...14 Annex 92 Program 2 ...
Page 93: ...Annex 14 93 Program 3 ...
Page 94: ...14 Annex 94 Program 4 ...
Page 95: ...Annex 14 95 Program 5 ...
Page 96: ...14 Annex 96 Program 6 ...
Page 97: ...Notes 15 97 15 NOTES ...