9
T-CONTROL
52
Term
Description
Unit
Displays the
requirement curve
.
Menu "Barrier times"
Barrier times
1
Time 1
1 - 2 times can be set. The second time can be added by the +. Example:
▪
time 1:
08:00
– 10:00
▪
time 2:
15:00
– 21:00
-
08:00
– 11:00
Setting up individual buffer tank loading times of every weekday, when it
will be not heated
-
By pressing the symbol Monday preset gets assigned to remaining
weekdays.
-
External requirement at digital input:
At a digital request the external set temperature gets transmitted as value to the heat supplier.
External requirement at analogue input:
At an analogue request a calculated (= linearly interpolated) temperature gets transmitted to the heat
supplier. For an understanding, fig 9.2
is to be used. The graph gets regulated by the parameters „analogue
m
ust temperature 4 mA“ and „analogue must temperature 20 mA“.
For example, at an analogue request with a current signal of 12 mA, a temperature of 60 °C is registered at
the heat supplier, provided that the digital requirement (= external must temperature) is not higher.
Summary of Contents for firematic CONDENSATION 30
Page 1: ...OPERATING INSTRUCTIONS Wood chips pellets heating system firematic CONDENSATION 30 40 ...
Page 83: ...Annex 15 83 15 ANNEX 15 1 Additional boiler module Hydraulic recommendation 1 ...
Page 84: ...15 Annex 84 Hydraulic recommendation 2 ...
Page 85: ...Annex 15 85 15 2 Solar module Program 1 ...
Page 86: ...15 Annex 86 Program 2 ...
Page 87: ...Annex 15 87 Program 3 ...
Page 88: ...15 Annex 88 Program 4 ...
Page 89: ...Annex 15 89 Program 5 ...
Page 90: ...15 Annex 90 Program 6 ...
Page 91: ...Notes 16 91 16 NOTES ...