Maintenance schedule
11
77
11.3
Biannual inspection
Item
Procedure
ID-fan
Function test of ID-fan using the aggregate
test
Check ID-Fan for abnormal or conspicuous
running noises
Light barrier
system (symbolic
representation)
Unscrew revision cover (depending on the
boiler type)
Clean
sensors
on
the
inside
of
the
intermediate hopper with soft tissue on the left
and right
Heat exchanger
Demount top boiler cover (1)
Unscrew
and
remove
heat
exchanger
insulation cover (2)
Remove deposit and check heat exchanger
visually for damages and wear.
Conduct function test of heat exchanger using
the aggregate test
Siphon
Clean or flush siphon
Ignition pipe
Clean from the back with cleaning brush
1
2
Summary of Contents for firematic CONDENSATION 30
Page 1: ...OPERATING INSTRUCTIONS Wood chips pellets heating system firematic CONDENSATION 30 40 ...
Page 83: ...Annex 15 83 15 ANNEX 15 1 Additional boiler module Hydraulic recommendation 1 ...
Page 84: ...15 Annex 84 Hydraulic recommendation 2 ...
Page 85: ...Annex 15 85 15 2 Solar module Program 1 ...
Page 86: ...15 Annex 86 Program 2 ...
Page 87: ...Annex 15 87 Program 3 ...
Page 88: ...15 Annex 88 Program 4 ...
Page 89: ...Annex 15 89 Program 5 ...
Page 90: ...15 Annex 90 Program 6 ...
Page 91: ...Notes 16 91 16 NOTES ...