11
Maintenance schedule
78
11.4
Annually inspection (service, notification)
Annual inspection, at least every 3000 operating hours
Maintenance by manufacturers or certified sales partners
Item
Procedure
Maintenance
Conduct system maintenance by authorised
personnel
Backfire
protection device
(symbolic
representation)
Unscrew revision cover (depending on the
boiler type)
Check BFP flap visually for damages, wear
and tightness
Open BFP flap by using the aggregate test
Position paper strip between hopper flange
and BFP flap and close BFP flap afterwards.
Try to pull out paper strip. If possible, adjust
BFP flap.
Conduct paper strip test at different positions
ID-fan
Unscrew 4x wing nut
Remove and clean ID-fan witch a brush
Summary of Contents for firematic CONDENSATION 30
Page 1: ...OPERATING INSTRUCTIONS Wood chips pellets heating system firematic CONDENSATION 30 40 ...
Page 83: ...Annex 15 83 15 ANNEX 15 1 Additional boiler module Hydraulic recommendation 1 ...
Page 84: ...15 Annex 84 Hydraulic recommendation 2 ...
Page 85: ...Annex 15 85 15 2 Solar module Program 1 ...
Page 86: ...15 Annex 86 Program 2 ...
Page 87: ...Annex 15 87 Program 3 ...
Page 88: ...15 Annex 88 Program 4 ...
Page 89: ...Annex 15 89 Program 5 ...
Page 90: ...15 Annex 90 Program 6 ...
Page 91: ...Notes 16 91 16 NOTES ...