Maintenance schedule
11
77
Item
Procedure
Fire extinguisher
Check fire extinguisher securing and seal
as well as hose and nozzle (according to
national standard)
Sensor barrier
Demount intermediate hopper cover
Unscrew revision cover
Clean sensors on the inside of the
intermediate hopper with soft tissue on
the left and right
Ash storage
Ash has to be stored in a non flammable,
air tight container till disposal.
Boiler room
Remove flammable materials, except
wood chips or pellets stored in a
appropriate container, from the operating
room
Fire protection
Check structural fire protection and fire
doors (e.g.: self-locking fire door)
Summary of Contents for firematic PELLET 120
Page 1: ...OPERATING INSTRUCTIONS Wood chips pellets heating system firematic PELLET 120 201 ...
Page 84: ...15 Annex 84 15 ANNEX 15 1 Additional boiler module Hydraulic recommendation 1 ...
Page 85: ...Annex 15 85 Hydraulic recommendation 2 ...
Page 86: ...15 Annex 86 15 2 Solar module Program 1 ...
Page 87: ...Annex 15 87 Program 2 ...
Page 88: ...15 Annex 88 Program 3 ...
Page 89: ...Annex 15 89 Program 4 ...
Page 90: ...15 Annex 90 Program 5 ...
Page 91: ...Annex 15 91 Program 6 ...
Page 92: ...16 Notes 92 16 NOTES ...
Page 93: ...Notes 16 93 ...