5
System
10
5
SYSTEM
5.1
System overview
Figure 5. 1 an example of a system with the following three components is shown:
(1) Storage room filling system
(2) Boiler
(3) Room discharge system
In the pictured case a rigid pellets-screw system with modular agitator system (3) is shown. The filling of the
fuel storage room is carried out with vertical filling screws (1). Please consider that the installed room
discharge and storage room filling system can be different to the displayed system. If all room discharge and
storage room filling systems of HERZ would be presented, the scope of this guide would be exceeded
considerably. More information can be provided by the company HERZ.
When the storage room will be filled, the agitator must turn.
The agitator with spring discharge or articulated arm or conveyor screw assists in emptying the storage
space. A complete emptying of the storage space is not guaranteed by the withdrawal system. The degree of
emptying depends on many factors that are not within the sphere of influence of Herz.
Figure 5. 1: System overview (example with agitator)
In the following chapter the boiler (2) and the room discharge system (3) and its individual components are
described and displayed.
1
2
3
Summary of Contents for firematic PELLET 120
Page 1: ...OPERATING INSTRUCTIONS Wood chips pellets heating system firematic PELLET 120 201 ...
Page 84: ...15 Annex 84 15 ANNEX 15 1 Additional boiler module Hydraulic recommendation 1 ...
Page 85: ...Annex 15 85 Hydraulic recommendation 2 ...
Page 86: ...15 Annex 86 15 2 Solar module Program 1 ...
Page 87: ...Annex 15 87 Program 2 ...
Page 88: ...15 Annex 88 Program 3 ...
Page 89: ...Annex 15 89 Program 4 ...
Page 90: ...15 Annex 90 Program 5 ...
Page 91: ...Annex 15 91 Program 6 ...
Page 92: ...16 Notes 92 16 NOTES ...
Page 93: ...Notes 16 93 ...