13
Maintenance schedule (Customer inspection)
78
Betriebsanleitung_pelletfire_Touch_Englisch_V1.2
13.2
Monthly (after 1000 hours)
Equipment area
Action
Heat recovery
areas
Cleaning of the heat recovery areas:
The heat exchanger pipes are to be
checked regularly for soiling and should
be
cleaned
manually
if
required
(Cleaning interval after 1000h, show on
display). Rust and fly ash deposits on the
heat recovery areas (16) have a
considerable effect on the economy and
performance of the boiler.
(1) Removing the upper boiler casing
(2) Loosening screw caps and removing
cleaning cover (12)
Heat recovery
areas
(3) Loosening
the
fixture
of
the
turbulators
(4) Removing
and
cleaning
of
turbulators (13)
1
2
3
4
Summary of Contents for pelletfire
Page 1: ...Operating instructions Log Wood Pellet heatingsystem pelletfire 20 40 ...
Page 86: ...16 Annex 86 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 Hydraulic recommendation 2 ...
Page 87: ...Annex 16 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 87 16 2 Solar module Program 1 ...
Page 88: ...16 Annex 88 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 Program 2 ...
Page 89: ...Annex 16 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 89 Program 3 ...
Page 90: ...16 Annex 90 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 Program 4 ...
Page 91: ...Annex 16 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 91 Program 5 ...
Page 92: ...16 Annex 92 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 Program 6 ...
Page 93: ...Notes 17 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 93 17 NOTES ...
Page 94: ...17 Notes 94 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 ...
Page 95: ...Notes 17 Betriebsanleitung_pelletfire_Touch_Englisch_V1 2 95 ...