15
The mounting pegs should rest at the bottom
of the keyholes when the cladding has been
positioned correctly.
Install all the panels in the bottom row before
starting on the second row of cladding stone.
Start by mounting the cladding stone to the
right of the door and work around the oven.
4 mm
E
E
E
E
The soapstone panels have no fixed top or bot-
tom, leaving you free to orient them how you
wish.
Eight cladding stone panels (E) are used for the
Scan-Line 80. These panels can be arranged
however you want, as the same type of clad-
ding stone panels are used on the opposite side
of the stove.
D
C
E
E
E
E
E
E
E
Fourteen cladding stone panels (E) are needed
for the Scan-Line 80 XL.
These panels can be arranged however you
want, as the same type of cladding stone panels
are used on the opposite side of the stove.
The panels will most likely require minor adjust-
ment after installation (as soapstone is a natu-
ral stone, and there is a high tolerance in the
production process for ceramic panels). Do this
by pushing the soapstone/ceramic panels side-
ways until the distances between the cladding
stones are equal.
Only sideways adjustment is possible.
C
D
Scan-Line 80
Scan-Line 80 XL
Summary of Contents for SCAN-LINE 80
Page 14: ...14...