Aruba 9012 Gateway
| Installation Guide
Installation |
15
Chapter 2
Installation
This chapter describes how to install an Aruba 9012 Gateway using the many mounting options
available. The 9012 gateway ships with an accessory kit that includes the equipment needed to install
the gateway in a standard, 19-inch telco rack or on a wall.
Installation Recommendations
For proper air circulation, leave at least 10 cm (4 inches) clearance on the left, right, front, and rear
side of the gateway.
Leave additional space in front and rear side of the gateway to access power cords, network
cables, and indicator LEDs.
Avoid placing anything on top of the gateway as it can lead to overheating of the gateway.
Avoid placing this gateway on any other device as the heat dissipated from the other device can
over heat the gateway.
Ensure that the rack is correctly and securely installed to prevent it from falling or becoming
unstable.
Precautions
Ensure that the rack is correctly and securely installed to prevent it from falling or becoming
unstable.
Dangerous voltage above 240 V AC is always present while the Aruba Power Supply Module is
plugged into an electrical outlet. Remove all rings, jewelry, and other potentially conductive
material before working with this device.
Never insert foreign objects into the chassis, power supply, or any other component, even when
the power supply is turned off, unplugged, or removed.
Ensure that the main power is fully disconnected from the gateway by unplugging all power cords
from their outlets. For safety, verify that the power outlets and plugs are easily reachable by the
operator.
Do not handle electrical cables which are not insulated. This also includes network cables.
Keep water and other fluids away from the gateway to minimize electrical hazards.
Comply with electrical grounding standards during all phases of installation and operation of the
product. Do not allow the gateway’s chassis, network ports, power supply, or mounting brackets
to contact any device, cable, object, or person attached to a different electrical ground. Also, never
connect the device to external storm grounding sources.
Perform installation or removal of the chassis or any module in a static-free environment. Proper
use of anti-static body straps and mats is strongly recommended.
Modules must be kept in anti-static packaging when not installed in the chassis.
Installation of the device should be performed by a trained installation professional.
Summary of Contents for Aruba 9012
Page 1: ...Aruba 9012 Gateway Installation Guide ...
Page 4: ...4 Aruba 9012 Gateway Installation Guide ...
Page 6: ...6 Preface Aruba 9012 Gateway Installation Guide ...
Page 14: ...14 9012 Gateway Aruba 9012 Gateway Installation Guide ...
Page 19: ...Aruba 9012 Gateway Installation Guide Installation 19 Figure 10 Wall Mounting ...
Page 20: ...20 Installation Aruba 9012 Gateway Installation Guide ...