Do not ship or store this product near strong electromagnetic, electrostatic, magnetic, or
radioactive fields.
This product, power cords, and all interconnected cables are for indoor use only.
Rack Mounting- Front and Rear
This mounting option allows mounting the 9012 gateway in a two-post 19-inch Telco rack.
Required Tools and Equipment
The following tools and equipment are required for installing a 9012 gateway:
Mounting Bracket (x2) (included in the kit)
Screws for mounting bracket (x8): M3 x 8 mm Phillips Flat Head Screws (included in the kit)
Screws for system rack mount (x4): M6 x 15 mm Phillips Pan Head Screws (included in the kit)
Suitable Screwdrivers for all screw types provided in the box (not included in the kit)
Installation Steps
To install a 9012 gateway into a two-post 19-inch Telco rack:
1. Place the mounting bracket over the mounting holes of the gateway. See
Figure 6
Rack Mount Bracket
2. Secure the bracket to the gateway using the eight screws for the mount bracket (four per bracket)
and a suitable screwdriver.
3. Mount the gateway within your organization’s rack system using the four screws for the system
rack mount (two per bracket) and a suitable screwdriver. See
Each 9012 gateway should have it’s own mounting equipment. Do not place other networking equipment directly
on top of a mounted gateway. Failure to do so can damage the device.
Some racks require screws that differ from those included with the 9012 gateway. Ensure that you have the correct
screws before installing the device.
Summary of Contents for Aruba 9012
Page 1: ...Aruba 9012 Gateway Installation Guide ...
Page 4: ...4 Aruba 9012 Gateway Installation Guide ...
Page 6: ...6 Preface Aruba 9012 Gateway Installation Guide ...
Page 14: ...14 9012 Gateway Aruba 9012 Gateway Installation Guide ...
Page 19: ...Aruba 9012 Gateway Installation Guide Installation 19 Figure 10 Wall Mounting ...
Page 20: ...20 Installation Aruba 9012 Gateway Installation Guide ...