Technical white paper
Page 28
Tighten the bolts in the four hold-down brackets to 16.9455 N-m (150 in-lb.) to secure the hold-down brackets to the pallet. Use a 14mm (9/16
in) open-end wrench. See figure 18.
Figure 18.
Positioning the rack onto the pallet
Close and lock both the doors.
Figure 19.
Closing the rack doors
Note
Before locking the rack doors, all servers and other equipment should be installed in the rack. Only equipment certified to ship in the
Infrastructure Racks should be installed at this time. Equipment not yet certified to ship in the Infrastructure Racks should be installed onsite at
the final destination to prevent damage to equipment while the rack is in transit.