CAUTION: Be sure to tighten each heatsink nut fully in the order indicated. Otherwise, boot failure or
intermittent shutdowns might occur.
c. Using a T-30 Torx screwdriver, fully tighten each heatsink nuts in the order indicated on the heatsink label (1 -2
-3 -4) until it no longer turns.
11. Install the processor mezzanine tray (Installing a processor mezzanine tray).
12. Install the air baffle (Installing the air baffle).
CAUTION: To avoid damaging the connectors, always install the air baffle into the server before installing the
riser cages.
Hardware options installation
125