WARNINGS
4
BEFORE INSTALLATION
5
Product Receipt
5
Model Identification
5
Ratings and Certifications
5
Component Locations
6
General Information
7
GENERAL SAFETY
8
Time/Temperature Relationships in
Scalds
8
INSTALLATION
9
Installation Codes
9
Equipment Base
9
Stacking
9
Clearances
11
Combustion and Ventilation Air
12
Conventional Combustion Air Supply
13
Water Piping
14
Hydronic Heating
16
Gas Supply
20
Electrical Power Connections
22
Field Wiring Connection
23
Venting
25
Changing the Flue Outlet
27
Venting Installation Tips
28
Venting Configurations
28
Controls
33
Outdoor Installation
33
Heater Sequence of Operations
34
87%-Efficiency Boilers –
Special Instructions
43
Water Piping
43
Wiring Diagrams
48
START-UP
50
Pre Start-up
50
Start-Up
51
OPERATION
54
Lighting Instructions
54
To Turn Of Gas To Appliance
54
TROUBLESHOOTING
55
MAINTENANCE
56
Suggested Minimum
Maintenance Schedule
56
Preventative Maintenance Schedule
56
APPENDIX
58
Inside Air Contamination
58
WARRANTIES
59
Type H and WH
59
Type P
60
CONTENTS
3