BS3 USV User Manual
27
Figure 2-9-2 Survey Line setting
Enter the
Name
in
Set Survey Line Name
window and start data recording.
Open the iBoat GCS software, click
Start
, the boat starts to run and survey along planned routes,
and the data are recorded simultaneously.
2.10 Stop the Recording
If users want to stop the measurements, just click the
Start
button again to stop recording.
2.11 Retrieve Boat
When retrieving the boat after surveying, drive the boat near the shore at a suitable place and
turn off the power.
Note: First make the stern go ashore and then the bow.
This is the opposite of the operation of
launching the boat; finally, turn off the controller.
2.12 Data Post-processing
2.12.1 Sampling
Click the
Sampling
of Hi-max to get the operating interface, as shown in figure
2-12-1
Surveying the W
orld, Mapping the Future