65
Change from hoist to hook operation
Operator's Manual GB
7.1
6. Wind the rope until the counterweight is
about 30 cm from the role
③
.
7. Attach the shekel to the loop at the edge of
the hoist.
8. Wind the rope until it settles on the roll
with slight tension.
9. Install hook on last extension.