10.5. Monthly inspection checklist
Operator
Document ID:
Crane s/n:
Date:
MONTHLY INSPECTION
Comments
Piston rods
Pivot pins and bushes
Bolts and screw fixings
Cables and sensors
Lubrication schedule
Slewing bearing / Upper column bearing
Pump attachment screws
Gateway connectivity
If you find a fault that prevents you from operating the crane safely, contact a Hiab authorised service workshop. Do not try to
repair the fault, it can cause you injury or you can damage the equipment.
Permission to reproduce this checklist is granted; however please note that only the original document owned by Hiab will
contain necessary amendments and updates. Hiab shall not be held liable if the copy in your possession does not contain the
latest changes.
Technical Data
HIAB L-HiPro 145/165/195/235
123