➃
➄
➂
➀
➁
➅
➂
➀
➁
➃
➄
105
Change from hoist to hook operation
Operator's Manual GB
7.1
4. Remove the rope guides
5. Remove the rope guide from the first
extension:
• Remove the locking pin
①
and the clevis pin
②
.
6. Remove the rope guide from the 4th exten-
sion:
• Remove the locking pin
③
, the nut
④
and
the shaft
⑤
.
7. Remove the top roller and fit the hook:
WARNING
To prevent injury, hold the top roller firmly in
your hand while demounting it.