1
5
2
3
6
4
7
8
9
13
Structure and parts of the HIAB crane
Operator's Manual GB
2.4
2.4
Boom system
The boom system consists of the following
components:
•
①
1st boom
•
②
2nd boom
•
③
Hydraulic extensions
The length of the hydraulic extension depends
on the type of crane.
•
④
Manual extensions [option]
•
⑤
Hoist [option]
•
⑥
Rope guide [option]
Only present if the crane is equipped with a
minimum of 3 hydraulic extensions.
•
⑦
Top roller [option]
The top roller must only be attached to a
hydraulic extension. Never to a manual exten-
sion.
•
⑧
Counterweight [option]
•
⑨
Hook [option]