Storage Enclosure Quick Start Guide 

2.7 m. The loading capability of the rack can be computed in 10 kg/U, e.g., for a 
4U chassis, the required loading capability of the rack is 40 kg. 

 

Ensure adequate air ventilation of the rack. 

 

Close all the doors and windows to prevent the dust or use a dust-filtering 
ventilation device. The dust particulate (≥5μm) must be less than 18,000 
particulate / (dm)³. 

 

In a conditions of non-working status of the device, the horizontal and vertical 
vibration acceleration value of the floor surface of equipment room must be 
lower than 0.5m/S². 

 

The rack or surface on which the device is installed must be properly grounded, 
and ensure that each device is grounded as well. The resistance between the 
device casing and the ground must be less than 4Ω. 

2.2 Installation and Initial Power-on 

 

The device shall be placed on the fixed flat surface. Tilting surface is not allowed. 

 

You can use the standard plate in the industrial cabinet or use the guide rail (not 
provided) to install the device to the rack. It is recommended to use the bolts to 
fix the device to the rack through the mounting screw holes on the rack. 

 

Connect all the power cords of the device to the power socket and wait for 12 
hours before starting up. The temperature of the device and the equipment 
room must be consistent to prevent the damage caused by a huge temperature 
difference. 

 

If the device has been transported and stored for more than 10 days; perform 
the previous operation and then start up and run the device for 30 minutes 
without the hard disks. And then you shut down the device, insert the hard disks 
and start the device again. 

2.3 Installation Notes 

 

The device is a high-precision equipment. Please keep stable and gentle when 
moving it. 

 

Installation and running environment must meet standards. Take regular 
investigations and records for the equipment room, or apply a remote 
monitoring for the working status of the device. 

 

Do not unplug the power cord when the device is running. 

 

In case of alarm beeper produced during the system running, please take 
immediate check and solution. 

2.4 Power on/off 

Step 1

 

If the storage enclosure is configured with redundant power supplies, please 
make all connections of the power. 

Summary of Contents for DS-AJ7824D

Page 1: ...Storage Enclosure Quick Start Guide...

Page 2: ...tioned below are the properties of their respective owners Legal Disclaimer TO THE MAXIMUM EXTENT PERMITTED BY APPLICABLE LAW THE PRODUCT DESCRIBED WITH ITS HARDWARE SOFTWARE AND FIRMWARE IS PROVIDED...

Page 3: ...vice must accept any interference received including interference that may cause undesired operation EU Conformity Statement This product and if applicable the supplied accessories too are marked with...

Page 4: ...Storage Enclosure Quick Start Guide 3 Applicable Models This manual is applicable to DS AJ7824D and DS AJ7824S...

Page 5: ...1 1 Power Supply System 7 2 1 2 Working Environment Control 7 2 2 Installation and Initial Power on 8 2 3 Installation Notes 8 2 4 Power on off 8 Chapter 3 Hardware Installation 10 3 1 Structure Appe...

Page 6: ...responsibility for any consequences resulted from violating security requirement criterion for design local regulations and specifications This manual may contain technical inaccuracies discrepancies...

Page 7: ...or low grade potential risks If you cannot avoid it may result in mild or moderate personal injury Danger Symbol it represents moderate or low grade potential risks If you ignore or cannot avoid the...

Page 8: ...ctions and the voltage between them must be less than 1V Grounding for AC power supply system ensure the GND line is properly connected The grounding for the chassis is recommended Grounding for DC po...

Page 9: ...the rack It is recommended to use the bolts to fix the device to the rack through the mounting screw holes on the rack Connect all the power cords of the device to the power socket and wait for 12 ho...

Page 10: ...e unit fails to start up please check all connections Step 4 Power off storage system and then power off storage enclosure You can also reboot the system in the storage system You are recommended to o...

Page 11: ...s for the status of power network and HDD 3 1 1 Front Panel Figure 3 1 Front Panel with Cover Figure 3 2 Front Panel without Cover Hard diskes of 3 5 inches are supported Slot order obeys the principl...

Page 12: ...old the button for 4 seconds And you can also force to power off the system by pressing and holding the button for 15 seconds The indicator shows green when the system is running Function button and b...

Page 13: ...SAS cable connection indicator 16 Host Up2 4 Host Up1 17 SAS cable connection indicator 5 Host Up2 18 SAS cable connection indicator 6 SAS cable connection indicator 19 Exp Down 7 SAS cable connectio...

Page 14: ...e enclosure or storage system Exp Down Connect the interface to lower level storage enclosure Fn indicator Used for locating storage enclosure Fn button Turn on off Fn indicator Power module 1 power m...

Page 15: ...efer to the List of Compatible HDD Models of our company for the recommended HDD models In order to avoid damages during transportation it is recommended to package and transport the hard disks separa...

Page 16: ...ur edges of the mounting bracket Make sure the HDD mounting bracket is steadily plugged to the chassis along the slot When you unplug the hard disk unplug it about 3cm away from the chassis and then m...

Page 17: ...system running so as to maintain long service life of the hard disks Take regular check and examine of the working status of the hard disks every two months or configure the system with auto check an...

Page 18: ...EXP Down of upper level storage enclosure EXP Down Connect EXP Down to Host UP interface of the lower level storage enclosure 4 1 DS AJ7824D For storage system with STAT HDD only one storage enclosur...

Page 19: ...Storage Enclosure Quick Start Guide 18 Figure 4 2 Wiring for SAS Interface...

Page 20: ...Storage Enclosure Quick Start Guide 19 4 2 DS AJ7824S Figure 4 3 Wiring...

Page 21: ...cting storage system with enclosure the more HDD the storage enclosure contains the more time HDD detection takes For details about supported storage enclosure and configuration refer to user manual o...

Page 22: ......

Reviews: