Chapter 3 Installation
3.1 Disassemble Pedestals
Before installation, you should use the key to open the pedestals.
View the pictures below to find the lock holes.
Figure 3-1 Lock Holes
3.2 Install Supercapacitor (Optional)
The supercapacitor supplies power for main lane control board and sub lane control board when
the device is powered off.
Before You Start
Ask our technique support and sales and purchase for the supercapacitor.
Steps
Note
• RISK OF EXPLOSION IF BATTERY IS REPLACED BY AN INCORRECT TYPE.
• DISPOSE OF USED BATTERIES ACCORDING TO THE INSTRUCTIONS.
• Refers to Components Introduction to view the supercapacitor's position.
• The working temperature of the supercapacitor is -40 °C to 70 °C (-40 °F to 158°F).
1. Remove the screws on the supercapacitor component to disassemble the supercapacitor
component.
2. Put the supercapacitor inside the component.