PRE-POWER CHECKLIST
Have you thoroughly examined the case for shipping damage? (see pg. 8)
Have you removed and discarded casters? (see pg. 8)
Have you checked the vertical plumb of the case? The horizontal level?
(see pg. 8)
Have you applied the foam tape gasket and sealant to the end breakers of
adjoining case? (see pg. 11)
Have you sealed the case-to-case joints by applying caulk and acrylic tape to
the pipe-chase seam? (see pg. 14)
Have you removed the shipping blocks from the refrigeration lines?
(see pg. 8)
Before powering-up the case, be certain that all of the steps listed below have
been completed to ensure proper case functionality, safety and compliance with
warranty terms.
Summary of Contents for JNRBHSA
Page 2: ...ii ...
Page 33: ...B2 SEISMIC BRACKETS 5 BRACKETS ...
Page 34: ...C1 SPORLAN PRESSURE TEMPERATURE CHART ...
Page 38: ...Display Cases 5XIILQ 0LOO 5RDG RORQLDO HLJKWV 9 E3 ELECTRICAL WIRING DIAGRAM ...
Page 39: ...Display Cases 5XIILQ 0LOO 5RDG RORQLDO HLJKWV 9 E4 ELECTRICAL WIRING DIAGRAM ...
Page 46: ...G1 FASCIA FRAME ...
Page 47: ...G2 FASCIA FRAME ...
Page 48: ...G3 FASCIA FRAME ...
Page 49: ...G4 FASCIA FRAME ...
Page 50: ...G5 FASCIA FRAME OPTIONAL MOTION SENSOR INSTALLATION ...
Page 51: ...G6 FASCIA FRAME OPTIONAL MOTION SENSOR INSTALLATION ...
Page 53: ...G8 FASCIA FRAME JNRZHSA 5 BALLOON GUARD INSTALLATION ...
Page 55: ...I1 CASE LIFTING LOCATIONS Base Frame Lifting Locations for Forklift JNRBHSA JNRZHSA ...
Page 56: ...I2 CASE LIFTING LOCATIONS Base Frame Lifting Locations for Forklift JNRBHSA JNRZHSA ...
Page 57: ...v Ϯ Z Ͳ ϱ Z EZ v Ϯ Z Ͳ ϰ Z EZ v ϱ EZ J1 CONDENSING UNIT LOCATIONS ...