12
Item 10: Restringing the Hoist
1. Cut the line sections for the complete hoist as per the Line Length Chart (see page 14).
2. Initially only restring the 4 outside line segments.
3. Attach the four outside line segments to each of the four outside tensioners, tension
the line.
Note:
ensure Cover Caps are threaded onto each line before tensioning and
fastening.
4. Look down each arm to ensure the squareness of the hoist.
5. Attach the remaining line segments.
6. Review all lines and check to determine if any segments require re-tensioning.
7. Fold the hoist up and down to ensure hoist is not over tensioned and restricting the
engagement of the Lower Cross and Latch with the Locking Collar.
8. Once complete, trim off excess line leaving about 10mm protruding from each tensioner.
Fit Cover Caps.
Item 11: Replacing the Ground Socket Locking Collar
1. Remove the Locking Pin from the bottom of Main Standard, use the
Pin Punch provided (Fig. 42).
2. Remove damaged part (Fig. 43).
3. Install a new part and replace the Locking Pin (Fig. 44).
Fig. 42
Fig. 43
Fig. 44
Summary of Contents for Rotary 400
Page 2: ......
Page 7: ...7 Fig 11 Fig 12 Fig 13 Fig 14 Fig 15 Fig 16 Fig 17 ...
Page 15: ...15 Notes Issue November 2007 ...
Page 16: ......